Make performance legible
Present the treatment stage, application and measurable benefit beside the relevant product or system.
Vietnam B2B trade-fair guide / Water & wastewater
Water and wastewater solutions in Ho Chi Minh City. Connect the technology on display with the operating problem it solves for utilities and industrial users.
Exhibitor planning angle
Confirm whether your stand uses working pumps, tanks or dry display models. Ask the organiser to confirm water, drainage, electrical and containment requirements before design approval.
This independent guide is for exhibition planning. Zeno is not the event organiser and does not sell admission or exhibition space.
What to resolve early
Present the treatment stage, application and measurable benefit beside the relevant product or system.
Separate any approved wet demonstration from meeting space and confirm safe containment and servicing access.
Confirm power, loading, rigging and operational requirements with the organiser using the current manual.
Work backwards from the permitted installation window and allow time for agreed checks.
From allocation to handover
Collect the latest exhibitor manual, floor plan, stand number, submission dates, service forms and move-in programme from the organiser.
Agree the audience, products, desired visitor action, demonstrations, meeting needs, storage, budget range and internal approval path.
Develop the approved booth direction against the allocated footprint and coordinate the information included in the agreed submission and production scope.
Build the contracted scope, coordinate installation within the confirmed programme and complete the agreed checks before the exhibitor team takes over.
Exhibiting at SECC?
Send the official manual, floor plan, stand number, budget range and internal approval date. Zeno can then scope the booth work against the actual event conditions.
Plan your exhibition booth↗